News · Richmond Hill, Ontario

Dave Barrow Civic Square: Richmond Hill’s new park and the toboggan hill it changes

Dave Barrow Civic Square is under construction beside Central Library, with completion expected at the end of 2027. Residents have questioned the loss of the familiar tobogganing slope.

In this story
Officials at the Dave Barrow Civic Square groundbreaking.
Groundbreaking photograph published by the city. This is a construction project, not a photograph of a completed park. Photo: City of Richmond Hill. Source.

The smallest hill can take up quite a lot of room

A hill does not need a marketing plan. Give it snow, a child and something that slides, and it has already organised a winter programme. Beside Richmond Hill’s Central Library, the familiar slope had another audience: people who enjoyed watching the children enjoy it.

Dave Barrow Civic Square will turn the green space beside Central Library into a year-round destination park. The city's plans include performances, a skating rink and natural areas. The same construction has prompted residents to mourn a much simpler use: children tobogganing on the familiar slope, with other generations enjoying the scene from the sidelines. The project adds facilities while changing an informal winter pleasure.

Source: Residents discuss the library toboggan hill, October 2026

A genuine addition, with a different winter promise

The city’s new destination park is at Yonge Street and Major Mackenzie Drive West, next to Central Library. The approved vision includes an amphitheatre and stage, an event lawn with seasonal skating, a plaza and terrace, trails, teaching garden and several kinds of planted landscape. It is intended to make the historic downtown a place to gather, rather than simply somewhere to pass through.

That is substantial public space. A performance, a shared evening outdoors and a greener place to pause are worthwhile ambitions. The city also plans to preserve the memorial bench honouring former mayor Dave Barrow. But a list of new features cannot, on its own, answer somebody who loved a particular old use of the site.

Source: City: Dave Barrow Civic Square construction and design

The distinction between a slope and a facility

The published park plan does not advertise a tobogganing facility. One resident also reported correspondence saying the final slope was not considered suitable for a formal one. That account remains attributed; stopping-distance and liability explanations offered locally are not independently established design findings.

An informal slope can become a community institution without being a designed sledding facility. Its value as play does not make safe runout irrelevant, while a safety concern does not erase the pleasure residents remember. The useful design question is whether a new space can preserve comparable opportunities for spontaneous winter activity alongside its formal programme.

Source: Residents discuss the library toboggan hill, October 2026

No skating plan for this coming weekend

The construction timetable is the practical point to take seriously now. The city expects work to continue to the end of 2027. The proposed seasonal rink is a future feature, not an invitation to arrive this November carrying skates and a thermos of optimism. Follow construction fencing and use current library access information.

Nor should an attractive rendering be mistaken for a final account of every everyday experience. Shade, comfortable seating, routes through the site and how people actually use a winter gathering space will matter after the ceremonial photographs. A park succeeds when ordinary people keep finding reasons to return. Children are particularly unforgiving judges of a facility whose chief attraction is its description.

Source: City: Dave Barrow Civic Square construction and design

What the argument is really protecting

There is no need to choose between welcoming the square and taking the loss seriously. The senior’s observation offers useful information about what a successful public space can do: bring different generations into the same scene without requiring them to buy anything, register or have the same interests. One person slides; another remembers.

The completed square may create its own versions of that pleasure. For now, the honest story is a promising new public place and a small old activity that mattered more than its size suggested. The hill did not have an engagement strategy. Apparently it had an audience.

Source: Residents discuss the library toboggan hill, October 2026

Source: City: Dave Barrow Civic Square construction and design

A new square changes how a place can be shared

The plan offers several forms of gathering rather than one large empty surface. A permanent stage and amphitheatre support performances; the event lawn changes with the season; paths connect planted areas. That mix could let visitors use the site at different times and for different reasons, including ordinary days without a booked event.

The tobogganing concern tests another kind of value: informal play that does not need programming. The affection is not simply resistance to change. Residents describe a pleasure shared by children and people who enjoyed watching them. The finished square can be judged on whether it creates equally accessible everyday moments, alongside the advertised events. That is a fairer question than asking the rendering to prove either that everything will improve or that everything worthwhile has been lost.

Source: City: Dave Barrow Civic Square construction and design

Source: Residents discuss the library toboggan hill, October 2026

Places in this story

Dave Barrow Civic Square project

Southwest corner of Yonge Street and Major Mackenzie Drive West, Richmond Hill, ON

Destination park under construction beside Richmond Hill Central Library.

Source: City: Dave Barrow Civic Square construction and design

More place details

Source: Compare these places in Resources

Source: Residents discuss the library toboggan hill, October 2026

Questions people ask

Where is Dave Barrow Civic Square?

At the southwest corner of Yonge Street and Major Mackenzie Drive West, beside Central Library in Richmond Hill.

Source: City: Dave Barrow Civic Square construction and design

Is the new square open now?

No. It is a construction project; the city expects completion at the end of 2027.

Source: City: Dave Barrow Civic Square construction and design

Will the square have skating?

The approved design includes a seasonal skating rink and event lawn. This is a future feature.

Source: City: Dave Barrow Civic Square construction and design

Can I skate there in November 2026?

The project is still under construction. Do not treat the planned rink as an operating attraction.

Source: City: Dave Barrow Civic Square construction and design

What happened to the library toboggan hill?

Residents have described changes during construction. One reported being told the final design did not regard the slope as suitable for a formal toboggan facility.

Source: Residents discuss the library toboggan hill, October 2026

Does the city’s announced feature list include a tobogganing facility?

The published design describes skating, an event lawn, performance spaces, gardens and trails. It does not advertise a tobogganing facility. Residents’ memories of the informal slope should be distinguished from a designed attraction.

Source: City: Dave Barrow Civic Square construction and design

What other features are planned?

An amphitheatre and stage, plaza, terrace, trails, teaching garden and several planted landscape areas are included.

Source: City: Dave Barrow Civic Square construction and design

Is the Dave Barrow memorial bench being kept?

The city says the memorial bench and quotation will be preserved within the new park.

Source: City: Dave Barrow Civic Square construction and design

Why do some residents miss the slope?

The October discussion described children playing and older residents enjoying the shared winter scene.

Source: Residents discuss the library toboggan hill, October 2026

Where can I check current project information?

Use the city’s project announcements and posted construction notices, rather than treating an old rendering as current access advice.

Source: City: Dave Barrow Civic Square construction and design

Something changed? Tell us about a correction.

Get in touch
My Richmond Hill

How can we help?